The master bath is coming together... here you see the double walk-in shower (half-tiled) and hot towel bar...
Wednesday, October 8, 2008
Bathroom, cabinets, lights
Tuesday, October 7, 2008
Nice fall day...
So Fall is starting to come to the lake... I bet the trees and the view will look even better in the coming weeks... This is the view from our lakeside deck...
Saturday, October 4, 2008
A quiet Saturday... another Penn State win...
We spent Saturday at the house watching Penn State beat Purdue... we do not have the satellite connected yet... but as we have the internet connection in + a SlingBox - we watched the game... did the traditional grub - wings, taquitoes, fried mozzarella, beer, chips & dip... before the game we took more pictures.
This is the great room... fireplace in... painting about done here... just need to have the television wall finished (trimming the lower part) and getting the flooring down...
Thursday, October 2, 2008
Paint, flooring, cabinets, septic, and fireplaces!
Wow - lots of updates... more painting complete. This is a view of the master bedroom (the silver part of the built-in headboard on our bed... and you can see the black wall of the master closet behind that)...
Friday, September 26, 2008
Painting, more on the kitchen island, heavy equipment
The painting is well under way... it's predominantly a mix of black and silver on the upper level (and we heard a lot of "we've never done a house like this" from the painter and the GC :-) )... the colors are looking very very nice though...
Tuesday, September 23, 2008
Roof and kitchen island
Friday, September 19, 2008
Doors & Tile & Floor
Tuesday, September 16, 2008
HVAC, data network
Sara and Michael took the day off today to spend the entire day at the property doing some catch up things. Much of the work was getting the cabling for the data network punched down and cleaned up.
Also good news is Frontier Communications finally got on site to put the DSL and voice lines in. The tech from Frontier was quite impressed (or maybe it was stunned) at the size of the data network for the house. He told he's not even seen a business infrastructure room wired so cleanly and thoroughly... I guess Michael's years of managing infrastructure in all those field sales office is paying off :-)
Also very exciting for the day was seeing the HVAC ducts get installed. To build the industrial / loft theme in the house, we are going with full exposed stainless steel duct work through most of the house.
Hoping to see the drywall folks back on site on Wednesday to get that finished... and ideally seeing roof and septic in place end of this week / early next week.
Saturday, September 13, 2008
Tape, mud, and Saturday breakfast
We spent a late Saturday morning / afternoon having breakfast... pancakes, sausage, homefries, juice, coffee... our first semi-formal breakfast in our new home... we were surprised to find this yellow truck in our driveway (and all our things missing from the garage). We then found out that there was a guy there to do taping and mudding on the drywall. And the stuff from the garage was moved into Michael's office as the drywall in the garage is getting finished.
Tuesday, September 9, 2008
Getting closer on the showers
So the concrete is finished in the shower floor...