Sunday, July 27, 2008

A busy day for us and the start of the electrical and data data network

Electrical box is in... Windows are almost all framed out (windows are supposed to be delivered Monday July 28... that will really feel like a big step forward)...
The conduits (the grey tube running down the of stud) for the all important technology cabling is getting installed... CAT6 and Coax to everyroom (multiples in some cases) and with the conduit, ease of future upgrades...
And we dropped off the CPI rack and shelves which will make up the network rack plus the stand for the AV equipment in the media room.
And Sara and I spent our entire Saturday with a cargo van from Enterprise running around picking up things and moving them from one place to another. To help move things along, we selected and transported the equipment for the 2nd full bath... and also got the ceiling fans, and some of the recessed lighting for the house. Picked up a very nice (and large) gas grill, and some tools that we needed... so we packed the van and unloaded everything at the site.
Needless to say, since neither of us has done true physical work in several years... we woke up quite tired and sore on Sunday.

The garage floor (and the front porch) were both poured as well.
We are really, really excited... while there is still lots of work to do... things are moving along quite nicely.