Monday, August 11, 2008

More electrical work

Looks like Friday was mostly an electrical day... Sara and I visited the site on Sunday to drop off the remaining lighting (we spent Saturday shopping at IKEA in Philadelphia for lights and steel baskets for our kitchen (that's what goes on the open shelves instead of drawers). Progress was slow on Friday... mostly electrical and some plumbing were done. You can see below that some of the extensive conduits are starting to make their way to the data closet.
And the wiring is finding it's way to the electrical panel (in fact, someone left a light on over the weekend!).
What you see below is very cool... it is the start of a built in A/V unit... the flat panel goes on the top and the equipment goes on the bottom... and the audio connections from the deck speakers and secondary speakers in the great room all feed through here...
Plumbing for the wet bar in the media room is getting roughed in...
When we were at the site today... it was pouring rain so we did not get out on the water... but we did catch up a couple points on things that are missing, so it was a productive day none the less... on Monday we start the first meeting with the security people and making preparations for the Grier family reunion (which we are hosting on Saturday, Aug 16)...

No comments: