Starting to see things coming together with the rough side of the mechanicals and plumbing taking shape. We are a bit disappointed with the amount of infrastructure that is not run though channels, but everything cannot be perfect (next time, if we do this again... when doing a custom job, HVAC and plumbers need to look at the plan and get there needs factored in as well... because we did not do this, we lose a bit of the space on the lower level to conceal things like the drainage pipe below).
Here you can see we have some of the HVAC in for the upper level (I think this is supposed to get started again on Friday, August 8). Note that we will be using all exposed industrial ductwork across the beams and down into the rooms, so it will get a bit of a loft feel.
And the pantry is getting framed out.... the powder room is on the right, a small pantry in the middle, then the next space will be for the freezer and more pantry space.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment